Projects in SindhPage: 1 The scope of work has been divided into two stages
In Stage I, the Financial Advisor (FA) will conduct the required due diligence (legal, financial, technical etc) , property survey, assessment of ...  Determination of status of mangroves in Indus delta in respect of area, density and health under the current pattern of discharges below Kotri and the changes in these subsequent to Kotri/Sukkur barra...  Supervision of detailed soil survey and drainage investigations for an area of 22,000 hectares in the Mirpur Khas Component Project area.
During the Left Bank Outfall Drain Stage 1 Project Preparat...  The project comprised the review and updating of the 1976 Project Planning Report; data collection, analyses, special studies and report production. The project area was located on the right bank of t...
|